Phase
II Master Plan
LEAPP was retained as part of an international team to
provide airport planning services to local engineering
consultant, Yooshin, in the master plan review and update
for the new 100mppa airport serving the capital of South
Korea. Specific studies carried out by staff for the Phase
II Master Plan included: |
Review of air traffic forecasts to determine the impact
of future peak period passenger and aircraft volumes, future
aircraft mix and parking stand requirements
Airside capacity assessment using computer simulation
for two close-spaced parallel runways, to establish the
need and timing for two additional runway,. simulation of
the 3rd and 4th runway airport was conducted to establish
the ultimate capacity of the airside system
Passenger terminal capacity analysis to determine capacity
constrained elements within the terminal, and the critical timing for enhancement
of the passenger processing facilities
Planning and design of terminal airspace procedures
to assess the impact of the restricted airspace associated
with the Demilitarized Zone immediately to the north of the
airport
| |